Key takeaways

Fill, sign, and submit AU SWMS from any browser — or have AI generate a custom version in seconds. No installs, no printing, no back-and-forth.

  • A Safe Work Method Statement (SWMS) outlines high risk construction activities, associated hazards, and measures to control health and safety risks.
  • Persons conducting a business or undertaking must prepare this document before commencing any high risk construction work at a workplace.
  • The document must identify high risk work, describe safety risks, and explain how control measures are implemented, monitored, and reviewed.
  • Though not legally mandated, contractors and responsible persons often sign the SWMS to confirm their understanding of the safety protocols.
  • You must prepare the SWMS before work begins and keep it available for inspection rather than filing it with an agency.
  • Failure to comply with SWMS requirements can lead to penalties including fines of up to $18,780 or six months of imprisonment.
  • The statement must be reviewed and revised as necessary to ensure it remains effective if the work changes or risks evolve.

What is AU SWMS?

Safe Work Method Statement (SWMS) Template is a document that sets out the high risk construction work activities to be carried out at a workplace, the hazards arising from these activities, and the measures to be put in place to control the risks. It serves as a vital tool for managing how specific tasks are performed by detailing the steps necessary to eliminate or minimize health and safety risks. By outlining these processes, the document ensures that all parties involved are aware of potential dangers and the established safety protocols.

The document must capture specific information including the identification of high risk construction work, associated hazards, and the implementation of control measures. It also describes how these measures will be monitored and reviewed to maintain effectiveness throughout the project. This documentation helps a person conducting a business or undertaking, such as a principal contractor, ensure that construction work safety is prioritized. This proactive approach helps prevent accidents and ensures compliance with relevant health and safety regulations during complex operations.

Safe Work Australia

Who needs the AU SWMS — and who doesn't

Not everyone files AU SWMS. The checklist below tells you whether it applies to your situation — and points you to the right alternative if it doesn't.

You need this AU SWMS if…

  • you are a person conducting a business or undertaking carrying out high risk construction work as defined by safety regulations
  • your construction project involves working at heights of 2 metres or more or in trenches deeper than 1.5 metres
  • the work includes demolition, structural repairs requiring temporary support, or the use of explosives
  • you are performing tasks near energized electrical installations, pressurized gas mains, or chemical and fuel lines
  • the work area involves the movement of powered mobile plant or potential exposure to a contaminated atmosphere

You do not need this AU SWMS if…

  • you are not carrying out high risk construction work as defined in WHS Regulation 291
  • your construction activities do not involve the specific high risk hazards identified in the Work Health and Safety Regulations

Why you need the AU SWMS

Why people fill out AU SWMS, and what tends to go wrong when they don't.

  • Avoid Legal Penalties Completing an SWMS is a legal requirement for high risk construction work. Failure to prepare or obtain this statement can lead to imprisonment or substantial fines totaling thousands of dollars.
  • Document Risk Controls The SWMS requires you to detail specific hazards and the measures used to control them. This systematic approach ensures that risks are properly identified, implemented, and monitored throughout the project.
  • Support Safety Accountability While not mandated by WHS regulations, it is common industry practice for contractors and people responsible to sign the SWMS. This process helps ensure that those performing work acknowledge safety protocols.
  • Secure Digital Management Manage your safety documents using pdfFiller to fill, sign, and store them in secure encrypted storage. This ensures your SWMS remains accessible for the required inspections and compliance reviews.

AU SWMS vs. similar documents

AU SWMS gets mixed up with similar documents more than most. Here's how to tell them apart, and what filing the wrong one actually costs.

Comparison criteria Safe Work Method Statement (SWMS) Template Work Health and Safety Management Plan (WHSMP)
Purpose Manage hazards for high risk construction work. Manage health and safety on construction projects.
When to use Before performing high risk construction work. Construction projects costing $250,000 or more.
Signatures required Not explicitly mandated by regulations. Not specified in provided documentation.
Filing Available for inspection; no agency filing. Not specified in provided documentation.
Governing reference WHS Regulations 2011 (Cth). Not specified in provided documentation.

What each section of AU SWMS means

Every section explained — what it's asking, the records you'll need on hand, and the mistakes that most often cause a rejection or follow-up request.

High Risk Work Identification Identify the specific high risk construction activities to be performed, such as work at heights or tasks involving mobile plant movement and structural alterations.
Hazards and Safety Risks Document all hazards related to the high risk construction work and describe the potential risks to the health and safety of everyone at the site.
Risk Control Measures Describe the specific safety measures and procedures that will be implemented to control, minimize, or eliminate the identified risks during the high risk work.
Monitoring and Review Process Outline the methods for implementing safety controls and detail how these measures will be monitored and reviewed to ensure they remain effective throughout the project.

How to fill out AU SWMS using pdfFiller

A walkthrough from the first field to the signature line. With your records in front of you, most people finish in under ten minutes.

  1. Access the Document Click Get Form to open Safe Work Method Statement (SWMS) Template in the pdfFiller editor to begin documenting your high risk construction work safety procedures and risk control measures immediately.
  2. Identify High Risk Tasks Use the text tool to specify which high risk construction activities apply to your project, ensuring the swms template accurately reflects the nature of the tasks being performed.
  3. Assess Hazards and Risks Click into the designated fields to list all potential hazards and risks to health and safety associated with each high risk construction task identified in your australian swms form.
  4. Outline Control Measures Type in the specific measures you will implement to eliminate or minimize identified risks, providing clear instructions for workers to follow during the high risk construction phase.
  5. Set Review Procedures Fill out the section regarding how control measures will be implemented, monitored, and reviewed, ensuring the document remains effective and compliant with current workplace health and safety regulations.
  6. Execute and Request Signatures Use the Sign tool to add your legally binding e-signature and request signatures from the Contractor and Person Responsible to confirm their understanding of the safety protocols.
  7. Secure and Share Once completed, save your document in pdfFiller's secure encrypted storage, which is compliant with SOC 2 and GDPR, then download the finished PDF or share it via email.

Deadlines, key dates & penalties for AU SWMS

When AU SWMS is due, what late filing actually costs, and how to request more time if you need it.

Preparation Deadline A Safe Work Method Statement (SWMS) must be prepared before high risk construction work begins and must be reviewed or revised if the work changes or new risks are identified.
Submission and Filing The document does not have a filing deadline with a government agency; however, it must be available for inspection at the workplace where the high risk construction work is being performed.
Penalties for Non-compliance Failure to prepare or obtain an SWMS before carrying out high risk construction work can result in 6 months of imprisonment, 60 penalty units (valued at $18,780 as of July 2023), or both.

Recent changes to AU SWMS

A Safe Work Method Statement (SWMS) does not have a central revision number or a fixed expiration date issued by a government agency. Because these documents are developed by the person conducting a business or undertaking (PCBU) to address specific project needs, the versioning is managed internally based on regulatory standards.

The statement must be reviewed and revised as necessary to ensure it remains current and effective for the duration of the high risk construction work. Revisions are required if the work environment changes, if new hazards are identified, or if the existing control measures are no longer adequate for maintaining health and safety.

Pointer: Ensure your document reflects the specific conditions and risks of the current project.

Key terms used in AU SWMS

A one-sentence glossary of the AU SWMS terms and concepts you'll see throughout this guide.

Safe Work Method Statement (SWMS)
A document outlining high risk construction activities, identifying potential hazards, and detailing measures to control health and safety risks.
Person Conducting a Business or Undertaking (PCBU)
An individual or organization responsible for ensuring the health and safety of workers performing high risk construction activities.
High Risk Construction Work
Activities defined by regulation, such as working at heights or near energized electrical lines, that require a safety method statement.
Control Measures
Actions or steps implemented to eliminate or minimize risks to health and safety as identified in a safety statement.
Hazards
Situations or things that have the potential to cause harm to people during high risk construction work activities.
WHS Management Plan
A comprehensive plan for managing safety on construction projects over $250,000, which may incorporate specific safety method statements.

Frequently asked questions about AU SWMS

Quick answers to the questions we hear most often about completing the AU SWMS.

A Safe Work Method Statement (SWMS) is a document that identifies high risk construction work activities, their associated hazards, and the control measures used to manage safety risks. It serves as a guide for workers to ensure that specific tasks are performed safely and in compliance with Work Health and Safety (WHS) regulations.

The person conducting a business or undertaking (PCBU) who carries out high risk construction work is responsible for preparing and implementing the SWMS. This typically includes principal contractors or employers. pdfFiller allows PCBUs to easily fill, sign, and share these safety documents with their team to ensure everyone is informed before work begins.

An SWMS must identify the high risk work, state the hazards and risks to health and safety, and describe the measures implemented to control those risks. It also must detail how those control measures are monitored and reviewed. You can use pdfFiller to edit, annotate, and manage these critical sections in a secure, encrypted digital environment.

Failure to prepare or obtain an SWMS before carrying out high risk construction work can result in six months of imprisonment or a fine of 60 penalty units. As of July 1, 2023, this fine amounts to $18,780. Keeping your documents in pdfFiller’s secure storage ensures they are always available for inspection to help you maintain compliance.

An SWMS must be reviewed and revised as necessary to remain current, particularly if the work changes or new risks are identified. Regular updates ensure control measures stay effective throughout the project. With pdfFiller, you can quickly update documents, use version comparison to track changes, and request new e-signatures from workers to confirm their understanding.

An SWMS focuses solely on high risk construction tasks, whereas a WHSMP is a broader safety plan for projects costing $250,000 or more. A WHSMP may actually include multiple SWMSs as part of its content. pdfFiller enables you to merge these separate documents into a single PDF or rearrange pages to keep your safety documentation organized.

Fill out AU SWMS on pdfFiller in 4 simple steps

Open, fill, sign, and share AU SWMS from any browser — or generate a custom version with AI in seconds. No installs, no printing, no back-and-forth.

The pdfFiller editor open in a web browser with AU SWMS loaded and ready to fill out

Your AU SWMS is safe with pdfFiller

Every document you fill and sign is protected with 256-bit encryption — both in transit and at rest — and stored on AWS cloud infrastructure. pdfFiller is independently certified and compliant with major security and privacy standards.

  • SOC 2 Type II certified — audited annually
  • HIPAA, GDPR, CCPA, and PCI DSS compliant
  • ESIGN Act compliant — legally binding eSignatures
  • Two-factor signer authentication
  • Detailed audit trail for every document action
Security and compliance certifications protecting documents stored on pdfFiller cloud
  • G2 — Users Most Likely To Recommend
  • G2 — Grid Leader in Small-Business
  • G2 — High Performer
  • G2 — Regional Leader
  • G2 — Easiest To Do Business With
  • G2 — Best Meets Requirements
  • G2 — Best Support

What people say about pdfFiller

Verified reviews from pdfFiller customers who use it to fill, sign, and manage their documents online.

THE SOFTWARE THAT I WAS TRYING TO USE FOR W2CS KEPT CRASHING. I FOUND THIS SOFTWARE AND IT HAS SAVED ME SO MUCH TIME IN FILLING OUT THE FORMS
GENEVIEVE
Its a great program. I'm able to adjust the margins of text well. I would recommend. Although $72.00 is a bit pricy.
Robert P

Fill, sign and send your AU SWMS — all in one place

Start with AU SWMS and keep going. pdfFiller gives you 2M+ ready-made templates, built-in eSignatures, and secure storage — everything you need to handle any document, without setup or extra tools.

2M+ templates · Zero setup · 24/7 human support

pdfFiller workspace showing a form being filled, signed and sent in one place

One tool. Every document task.

One workflow shouldn’t take five tools

Start free trial